[1]
Inglesi-Lotz, R. and Blignaut, J. 2012. Estimating the opportunity cost of water for the Kusile and Medupi coal-fired electricity power plants in South Africa. Journal of Energy in Southern Africa. 23, 4 (Nov. 2012), 76–84. DOI:https://doi.org/10.17159/2413-3051/2012/v23i4a3180.