Using liquefied petroleum gas to reduce the operating cost of the Ankerlig peaking power plant in South Africa

Authors

DOI:

https://doi.org/10.17159/2413-3051/2022/v33i2a13453

Abstract

Along with the load-shedding problem that Eskom is having with the current generation system, the operator is forced to use its peaking plants at Ankerlig and Gourikwa in the Western Cape much more than planned. The two plants are set up for dual fuel operations, able to be fuelled with diesel as well as gas. As Eskom does not have access to natural gas, both plants have been fuelled with diesel. For the last three years, 2019 through 2021, Eskom has expended an average of over R4 billion per year on diesel fuel for its peaking plants, with the majority of this at Ankerlig and Gourikwa. For 2022, in their request for a rate increase, Eskom noted that their anticipated diesel fuel expenditures will increase to over R6.5 billion. This could be reduced by more than half if the plants were fuelled with natural gas. The problem Eskom faces is sourcing natural gas to fuel these plants. There has been consideration of liquefied natural gas importation into the Western Cape that could be utilised to fuel the Ankerlig plant. However, the high capital cost for this option has led to delay in the commencement of this project. There is another alternative that can be implemented in a short time-frame, using currently available gas, in the form of liquefied petroleum gas. With this fuel, the Ankerlig peaking plant could be switched to gas fuel and Eskom would have a significant reduction in the cost of fuel. In this study the economic benefit of this fuel change option is analysed.

Downloads

Download data is not yet available.

References

Allen Consulting. 2009. Review of the appropriateness of the current LPG international benchmark in the setting of domestic LPG prices. Available: https://www.accc.gov.au/system/files/Review of the appropriateness of the current LPG international benchmark in the setting of domestic LPG prices - October 2009.pdf.

Avedia Energy. 2022. Avedia Energy. Available: https://avediaenergy.com/.

Bidvest. 2020. LPG and the Mounded LPG Facility Mounded LPG Facility fast facts. Available: https://www.bidvest.co.za/bidvest-tank-terminals/about-Mounded-LPG-Facility.php [2020, September 20].

Clark, S., Van Niekerk, J. & Petrie, J. 2020. The Use of Natural Gas to Facilitate the Transition to Renewable Electric Power Generation in South Africa. Stellenbosch University. Available: https://scholar.sun.ac.za/handle/10019.1/109312.

Creamer, T. 2022. Eskom seeks to show prudency of running diesel plants as its pegs cost of load-shedding at R9.53/kWh. Engineering News. Available: https://www.engineeringnews.co.za/article/eskom-seeks-to-show-prudency-of-running-diesel-plants-as-its-pegs-cost-of-load-shedding-at-r953kwh-2022-01-20.

DailyFX. 2022. Crude Oil Prices. Available: https://www.dailyfx.com/crude-oil.

Delphos International Ltd. 2019. Feasibility Study for the Western Cape Integrated Liquefied Natural Gas Importation and Gas-to-Power Project. Cape Town. Available: https://www.westerncape.gov.za/110green/download-lng-feasibility-study.

Eskom. 2012. Integrated Report for the year ending 31 March 2012. Available: www.eskom.co.za/IR2012/027.html.

Eskom. 2014a. Ankerlig and Gourikwa gas turbine power stations. Available: https://www.eskom.co.za/sites/heritage/Pages/ANKERLIG-AND-GOURIKWA.aspx [2020, September 20].

Eskom. 2014b. Integrated Results for the year ending 31 March 2014. Available: https://www.eskom.co.za/wp-content/uploads/2022/01/full-integrated2014.pdf.

Eskom. 2016. Integrated Report for the year ending 31 March 2016. Available: https://www.eskom.co.za/wp-content/uploads/2021/02/Eskom_integrated_report_2016.pdf.

Eskom. 2018. Integrated Report for the year ending 31 March 2018. Available: www.eskom.co.za/IR2018.

Eskom. 2019. Integrated report for the year ending 2019. Available: https://www.eskom.co.za/IR2019/Documents/Eskom_2019_integrated_report.pdf.

Eskom. 2020. Integrated Report of the year ending 31 March 2020. Available: https://www.eskom.co.za/IR2020/Documents /Eskom 2020 integrated report.pdf.

Eskom. 2021. Intergrated Report for the year ending 31 March 2021. Available: https://www.eskom.co.za/wp-content/uploads/2021/08/2021IntegratedReport.pdf.

Gwegwe, S. 2021. Petrol and diesel price: Fuel costs go up for November. The South African. (November). Available: https://www.thesouthafrican.com/news/petrol-and-diesel-price-increase-november-south-africa/.

Investing.com. 2022. LNG Japan/Korea Marker PLATTS Future Historical Prices. Available: https://www.investing.com/commodities/lng-japan-korea-marker-platts-futures-historical-data [2022, January 23].

MOGs. 2020. Sunrise Energy LPG Terminal. Available: https://mogs.co.za/oil-gas-services/operations/sunrise-energy/ [2020, September 20].

Ryskamp, R. 2017. Emissions and Performance of Liquefied Petroleum Gas as a Transportation Fuel: A Review. Available: https://auto-gas.net/wp-content/uploads/2019/11/2017-WLPGA-Literature-Review.pdf.

DMRE [Department of Mineral Resources and Energy] 2021. Published for public comments: Draft Liquefied Petroleum Gas Rollout Strategy, Available: http://www.energy.gov.za/files/policies/Gazette44384-for-comments-Draft-LPG-rollout-strategy.pdf.

DMRE. 2020. Breakdown of petrol, diesel and paraffin prices as of 05 February 2020. Available: http://www.energy.gov.za/files/esources/petroleum/February2020/Breakdown-of-Prices.pdf.

DoE.[Department of Energy] 2011. Integrated Resource Plan for Electricity 2010-2030. DOI: 10.1016/j.wneu.2010.05.012. DOI: https://doi.org/10.1016/j.wneu.2010.05.012

DoE. 2018. Integrated Resource Plan for South Africa (2018). Available: http://www.energy.gov.za/IRP/irp-update-draft-report2018/IRP-Update-2018-Draft-for-Comments.pdf.

DoE. 2019. Integrated Resource Plan for South Africa (2019). SouthAfrica. Available: http://www.energy.gov.za/files/docs/IRP 2019.pdf.

US EIA [US Energy Information Agency]. 2017. How much carbon dioxide is produced when different fuels are burned? Available: https://www.eia.gov/tools/faqs/faq.php?id=73&t=11 [2020, September 20].

US EIA. 2022. Petroleum and other Liquids - Spot Prices. Available: https://www.eia.gov/dnav/pet/PET_PRI_SPT_S1_M.htm [2022, January 23].

US EIA. n.d. How much coal, natural gas, or petroleum is used to generate a kilowatthour of electricity? Available: https://www.eia.gov/tools/faqs/faq.php?id=667&t=6 [2020, September 20].

US EPA.[US Environmental Protection Agency] 2021. Global Methane Initiative, Importance of Methane. Available: https://www.epa.gov/gmi/importance-methane#:~:text=Methane is also a greenhouse,-influenced) and natural sources.&text=Methane is more than 25,trapping heat in the atmosphere. [2021, May 25].

Western Cape Government. 2021. Parliament of the Province of the Tablings and Committee Reports - chapter 5. Available: https://www.wcpp.gov.za/sites/default/files/Final Atc 14-2021 19 February 2021 Report Oversight visit_ Eskom Atlanitis Eng..pdf.

World Bank. 2021. World Bank Commodities Price Forecast (nominal US dollars). Available: https://thedocs.worldbank.org/en/doc/ff5bad98f52ffa2457136bbef5703ddb-0350012021/related/CMO-October-2021-forecasts.pdf.

Ankerlig Power Station (Eskom)

Downloads

Published

2022-06-17

How to Cite

Using liquefied petroleum gas to reduce the operating cost of the Ankerlig peaking power plant in South Africa. (2022). Journal of Energy in Southern Africa, 33(2), 15-23. https://doi.org/10.17159/2413-3051/2022/v33i2a13453